Penggunaan Standar Metode Work Breakdown Structure (WBS) Pada Proyek Pembangunan Gudang BPBD dan Rumah Jabatan Dandim

  • Try Sugiyarto Soeparyanto Universitas Halu Oleo
  • Ridwan Syah Nuhun Universitas Halu Oleo
  • Ismayana Ismayana Universitas Halu Oleo
  • Meri Apriani Universitas Halu Oleo
  • Hado Hado Universitas Sulawesi Tenggara
Keywords: Building, Construction Project, Work Breakdown Structure

Abstract

In today's modern era, the construction of buildings stands as a crucial element in the development of infrastructure. Among the various methods utilized for managing such construction projects, the Work Breakdown Structure (WBS) has emerged as an effective tool. WBS serves as a project management technique, breaking down complex tasks into smaller, manageable components, thereby facilitating efficient planning, execution, and monitoring throughout the project lifecycle.This research employs the Earned Value Method (EVM) approach, chosen for its adeptness in quantifying project cost and time performance. By integrating three key dimensions - scope, schedule, and budget - EVM offers a comprehensive framework for evaluating project performance.The findings of this study reveal subpar cost and time performance in the construction of the BPBD Warehouse and Military District Commander's office building. Conversely, the construction of the Veterans Building demonstrates stable performance in both cost and time aspects.The observed impact of implementing WBS standards, particularly in the construction of the Veterans Building, proves instrumental in enhancing project control. The detailed breakdown of work items and the clearer identification of required resources streamline the planning of Purchasing Orders (PO), thereby facilitating cost management efforts.

Downloads

Download data is not yet available.

References

Akrami, A. (2015). Consequences of Improper Preparation of Work Breakdown Structure (WBS) and Schedule of Civil Projects. Advances in Environmental Biology (AENSI Journals), 434-437.

Guide, P. (2018). A Guide To The Project Management Body Of Knowledge. Pensylvania: Project Management Institute.

Hans, R. (2013). Work Breakdown Structure : A Tool For Software Project Scope Verification. International Journal of Software Engineering & Applications (IJSEA), 4(4).

Herzanita, A. (2019). Penggunaan Standard WBS (Work Breakdown Structure) Pada Proyek Bangunan Gedung. Jurnal Infrastruktur, 5(1), 29-34.

Lottfy, E. (2014). Labor Productivity Improvement In Construction Projects Using WBS & OBS Integration. PM World Journal Labor Productivity Improvement In Construction Projects.

Messah, Y. A., Lona, L. H., & Sina, D. A. (2013). Pengendalian Waktu dan Biaya Pekerjaan Konstruksi Sebagai Dampak dari Perubahan Desain (Studi Kasus Embung Irigasi Oenaem, Kecamatan Biboki Selatan Kabupaten Timor Tengah Utara). Jurnal Teknik Sipil, 2(2), 121-132.

Mu'Afaq, M. N., Yasin, S. Y., Arifandi, A., & Yaqin, M. A. (2020). Pemodelan Proses Bisnis Organisasi Pondok Pesantren Berdasarkan Standar Sekolah Berasrama Menggunakan Work Breakdown Structure (WBS). ILKOMNIKA : Journal Of Computer Science and Applied Informatics, 2(3), 240-282.

PMI. (2005). Practice Standard For Earned Value Management. Pensylvania: Project Management Institute, Inc.

Sediyanto, & Hidayat, A. (2017). Analisa Kinerja Biaya dan Waktu Pada Pelaksanaan Proyek Konstruksi dengan Metode Earn Value (Studi Kasus Proyek Konstruksi Mall dan Hotel X di Pekan Baru). Jurnal Ilmu Teknik dan Komputer, 1(1), 36-51.

Supriadi, L. S., Latief, Y., Susilo, B., & Rajasa, M. (2017). Development Of Risk-Based Standarized WBS (Work Breakdown Structure) For Cost Estimation Of Apartments Project. International Journal of Civil Engineering and Technology (IJCIET), 8(10), 822-833.

Van Wyngaard, C. J., Pretorius, J. H., & Leon, P. (2012). Theory of The Triple Constraint - a Conceptual Review. Preceedings of the 2012 IEEE IEEM.

Yuswardi, Winata, W., Erwin, Steven, Andrean, & Vinchen, H. (2023). Analisa Penelitian Manajemen Proyek Yang Diterapkan Usaha "Tatakanku". Jurnal Mirai Management, 8(2), 88-95.

Published
2024-10-25
How to Cite
Soeparyanto, T., Nuhun, R., Ismayana, I., Apriani, M., & Hado, H. (2024). Penggunaan Standar Metode Work Breakdown Structure (WBS) Pada Proyek Pembangunan Gudang BPBD dan Rumah Jabatan Dandim. Sultra Civil Engineering Journal (SCiEJ), 5(2), 300-307. https://doi.org/10.54297/sciej.v5i2.626

Most read articles by the same author(s)