Efektivitas Metode Zero One Dalam Manajemen Resiko Pekerjaan Konstruksi Gedung Berlantai (Studi Kasus Gedung Kuliah Fakultas Kehutanan Dan Ilmu Lingkungan Universitas Halu Oleo Kendari)
Abstract
This study aims to analyze the visibility of the Zero-One method in the construction of the Faculty of Forestry and Environmental Sciences Building, Halu Oleo Kendari University, Southeast Sulawesi. The results of the analysis showed that a weak control system was the main cause of delays and additional costs in this project. This variable has the highest weight, reaching an average of 90.38, in line with secondary data in the form of monthly reports from the project which show that there is a delay of 1-2 weeks of working days in the process of vertical formwork on floor plate work 2-3, this has a major impact on project time and cost. Corrective measures that can be suggested include optimization of staff performance through material training and risk management, as well as better strategies to address weak systems and avoid delays. The results of this analysis also highlight other risks such as errors in budget planning, material expenditure, and inefficient use of materials. This research was conducted by collecting data from 9 respondents involved in the project. In parallel with the secondary findings of the monthly report of the project, it was identified that there were delays in certain construction processes. Addressing efforts include increasing working hours and manpower to catch up with delays and minimize the addition of inefficient costs. The study provides valuable insights for improving risk management and efficiency in construction projects, focusing on cost and time control systems.
Downloads
References
Isawati, I., Hartono, W. and Sugiyarto, S. (2017) ‘Analisis Value Engineering Dengan Metode Paired Comparison Pada Proyek Pembangunan Gedung Laboratorium Komputer Kampus 3 Universitas’, Matriks TeknikSipil, 5(1), pp. 83–89. Available at: https://scholar.google.com/scholar?q=Analisis+Value+Engineering+Dengan+Metode+Paired+Comparison+Pada+Proyek+Pembangunan+Gedung+Laboratorium+Komputer+Kampus+3+Universitas+Ahmad+Dahlan+Yogyakarta&btnG=&hl=en&as_sdt=0%2C5.
Kusuma Tama, A., Anggraini, L. and Tutuko, B. (2022) Analisis Kinerja Manajemen Konstruksi Pada Proyek Gedung Digitasi Universitas Negeri Semarang.
Saputro, C.D. (2022) ‘Analisis manajemen risiko proyek bangunan gedung bertingkat dengan metode severity index’, 6(September), pp. 140–147.
Soeryodarundio, K., Setiono, S. and Soengkar, R.R. (2022) ‘Analisis Manajemen Risiko Proyek Dengan Metode Zero-One (Studi Kasus: Proyek Pembangunan Gedung Perpustakaan Universitas Islam Internasional Indonesia Depok)’, Matriks Teknik Sipil, 10(4), p. 375. Available at: https://doi.org/10.20961/mateksi.v10i4.63972.
Wicaksono, H. and Teki, H. (2023) ‘Analisis Risiko Pada Proyek Konstruksi Pembangunan Gedung Negara Imigrasi Kelas III Non TPI Di Kota Kediri dengan Menggunakan Metode House Of Risk’, 4.
Zain, A.M. and Andajani, S. (2021) ‘Analisis Pemilihan Lokasi Bendung Menggunakan Metode Zero One’, Prosiding Seminar Intelektual Muda, 2(1), pp. 92–97. Available at: https://doi.org/10.25105/psia.v2i1.8958.
Copyright (c) 2024 Try Sugiyarto Soeparyanto, Jalba Nirah, Ridwan Syah Nuhun, La Ode muhammad Fadil, Dhalmaz Prasetya, Dwi Bayu Putra P, Muhammad Alfian Ali
This work is licensed under a Creative Commons Attribution 4.0 International License.