Analisis Manajemen Konstruksi Pada Pembangunan Ruas Jalan Rate-Rate Dalam Kota

  • Ridwan Syah Nuhun Universitas Halu Oleo
  • Try Sugiyarto Soeparyanto Universitas Halu Oleo
  • Gede Agus Sutrayasa Universitas Halu Oleo
  • Laode Deny Universitas Halu Oleo
  • Kadir Ramadan Universitas Halu Oleo
  • Galih Adi Sulistyo Universitas Halu Oleo
Keywords: Construction Management, Cost Budget, Implementation Methods

Abstract

Road infrastructure development is an important factor in supporting economic growth and community mobility in urban areas. However, road construction in urban areas is often faced with various challenges, such as limited space, population density and the dynamics of community activities. This requires effective and efficient construction management to ensure the smoothness and success of the project. The aim of this research is to find out how cost calculations are carried out using AHSP and also to find out how to carry out and time schedule construction work for inner city lane roads. The method for implementing the construction of lane roads in the city is in the form of asphalting roads with a length of 3.06 KM and a duration of 90 days. The budget plan for building a 3.6 KM inner-city toll road is IDR. 10,428,920,000.

Downloads

Download data is not yet available.

References

Akbar, Y. R. (2022). Penentuan Jalur Kritis Untuk Manajemen Proyek ( Studi Kasus Pembangunan Jalan Selensen- Kota Baru- Bagan Jaya ). 2(2), 6–13.

Ayatullah, M. A., & Sarmingsih, A. (2023). Analisis Manajemen Waktu Pada Proyek Pembangunan Jalan Parang Garuda East Kawasan Industri Kendal. 1(3), 88–92.

Fiyandi, A., Sugiyanto, M. A., & Roesdina, T. (2022). Analisis Manajemen Konstruksi Jembatan Cisumengka Jalan Bebas Hambatan Cileunyi Sumedang Dawuan ( Cisumdawu ) Tahap Iii Meter ; Kolom Tinggi. 02, 49–58.

Hayati Ida, N. (2014). Analisis Biaya Konstruksi Pada Proyek Jalan Di Kota Bogor. 3, 27–39.

Hulu, Y. (2022). Analisa Manajemen Konstruksi Pada Proyek Pembangunan Jembatan Tano Ponggol Sumatera Utara. 11(2), 277–285. Https://Doi.Org/Http://Dx.Doi.Org/10.46930/Tekniksipil.V11i2.2757

Larasari, O. (2018). Analisis Manajemen Konstruksi Pada Proyek Pembangunan Rsud Brebes. Vii(2), 61–80.

Mahar Ramadhan, P. (2022). Analisis Manajemen Konstruksi Pada Jembatan Cikeusal. X(1), 1–6.

Sendroro Gulo, C. (2024). Analisa Manajemen Konstruksi Pada Pembangunan Jalan Desa Strategis Ruas Fukahumene - Objek Wisata Pantai Humene Sunset Dimulai Dari Loloana’a.13(1),118–123. Https://Doi.Org/Http://Dx.Doi.Org/10.46930/Tekniksipil.V13i1.4241

Tawakal, M. I., Hidayat, A., & Rahmi, A. (2016). Analisis Manajemen Waktu Pada Proyek Konstruksi Jalan Studi Kasus Pt. Sarana Andalan Semesta Di Kabupaten Rokan Hulu. Artikel Ilmiah, Universitas Pasir Pengairan.

Wati, I., Nurmiati, Z., & S, N. A. (2018). Analisis Penerapan Manajemen Waktu Pada Proyek Jalan Kabupaten Polewali Mandar. 1(1), 14–24.

Yuliana, A. (2020). Analisis Penerapan Manajemen Proyek Rekonstruksi Pada Ruas Jalan Kwandang - Molingkapoto Prov. Gorontalo. 4(1), 72–78.

Published
2024-10-24
How to Cite
Nuhun, R., Soeparyanto, T., Sutrayasa, G., Deny, L., Ramadan, K., & Sulistyo, G. (2024). Analisis Manajemen Konstruksi Pada Pembangunan Ruas Jalan Rate-Rate Dalam Kota. Sultra Civil Engineering Journal (SCiEJ), 5(2), 286-292. https://doi.org/10.54297/sciej.v5i2.609