Cost Evaluation and Analysis Of Occupational Safety And Health (K3) Implementation In The Poleang Central Market Development Project

  • M. Awal Rafli Janwar Universitas Sulawesi Tenggara
  • Andi Makkawaru Universitas Sulawesi Tenggara
  • Sufrianto Sufrianto Universitas Sulawesi Tenggara
  • Hado Hado Universitas Sulawesi Tenggara
Keywords: OSH Cost Planning, Personal Protective Equipment, Government, Companies, Workers

Abstract

Occupational Safety and Health (K3) issues in general in Indonesia are often neglected. This is indicated by the still high number of work accidents. This general problem regarding K3 also occurs in construction operations. The construction service sector is one of the sectors most at risk of work accidents. Loss of life, material, money and time are the consequences which of course will directly hinder the implementation of construction projects. Occupational safety and health aims to create conditions that support work comfort for workers. Occupational Health and Safety (K3) is often neglected, because it is considered a waste of time, moreover it costs a lot of money for (K3). Therefore, planning for Occupational Safety and Health Costs in Building Construction Projects is required. The total cost for the construction of the Poleang Central Market in Bombana district is IDR 39,927,000,000. Meanwhile, the cost allocation for the application of occupational safety and health (K3) required in the Development of the Poleang Central Market in Bombana Regency is Rp. 84,150,000.00 (0.211%). Based on observational data obtained in the field, the implementation of occupational safety and health (K3) in the Poleang Central Market development project is generally good

Downloads

Download data is not yet available.

References

Djatmiko, 2016. Keselamatan dan Kesehatan Kerja. Edisi 1. Penerbit Deepublish, Jogjakarta.

Jawat, I. W., & Suwitanujaya, I. N. 2018. Estimasi Biaya Pencegahan Dan Pengawasan K3 Pada Proyek Konstruksi. Jurnal Teknik Sipil, Universitas Warmadewa, Denpasar, Bali, 7(1), 88–101.

Pangkey, F., Malingkas, G. Y., & Walangitan, D. O. R. 2012. Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja (SMK3) Pada Proyek Konstruksi Di Indonesia (Studi Kasus: Pembangunan Jembatan Dr. Ir. Soekarno-Manado). Jurnal Ilmiah Media Engineering. Fakultas Teknik Universitas Sam Ratulangi, vol.2 (2), pp: 100–113.

Raharjo, S. dkk. 2016. Evaluasi Marka Yellow Box Junction ( Studi Kasus : Simpang Jln.Ahmad Yani – Jln.Kh.Ahmad Dahlan – Jln.Sultan Abdurrahman – Jln.Gusti Sulung Lelanang Dan Simpang Jln.Tanjungpura – Jln.Imam Bonjol – Jln.Pahlawan – Jln.Sultan Hamid Pontianak ) Jurnal Teknik Sipil, vol. 6(3) pp: 1-10.

Ramli, Soehatman. 2010. Pedoman Praktis Manajemen Resiko dalam Perspektif K3, Dian Rakyat, Jakarta.

Rawis, T. D., Tjakra, J., & Arsjad, T. T. 2016. Perencanaan Biaya Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Konstruksi Bangunan (Studi Kasus: Sekolah St.Ursula Kotamobagu). Jurnal Sipil Statik, vol. 4 (4), pp: 241–252

Published
2023-04-29
How to Cite
Janwar, M. A., Makkawaru, A., Sufrianto, S., & Hado, H. (2023). Cost Evaluation and Analysis Of Occupational Safety And Health (K3) Implementation In The Poleang Central Market Development Project. Sultra Civil Engineering Journal, 4(1), 55-66. https://doi.org/10.54297/sciej.v4i1.462

Most read articles by the same author(s)

1 2 3 4 > >>