Faktor-Faktor Yang Mempengaruhi Mutu Pelaksanaan Proyek Peningkatan Jalan Tedubara-Pising Kabupaten Bombana

Factors Affecting the Quality of Implementation of the Tedubara-Pising Road Improvement Project in Bombana Regency

  • Rahmat Ali Universitas Sulawesi Tenggara
  • Irwan Lakawa Universitas Sulawesi Tenggara
  • Sitti Hawa Universitas Sulawesi Tenggara
  • Sufrianto Sufrianto Universitas Sulawesi Tenggara
Keywords: Quality, Project, Road Improvement

Abstract

This study aims to analyze the factors that influence the quality of the implementation of improving the Tedubara-Pising street in Bombana Regency. This study uses quantitative data analysis techniques with a sample size of 30 respondents. The results showed that the factors affecting the quality of the Tedubara Pising road improvement in Bombana Regency were financial indicators (X3) 21.97%, followed by Human Resources indicators (X1) 20.14%, location indicators (X5) 19.68 %, material indicator (X2) 19.22%, and the lowest is equipment indicator (X4) 18.99%. Factors related to the quality of road improvement, namely the human resources variable with a value of 0.855 and material with a value of 0.853. This shows a very strong relationship

Downloads

Download data is not yet available.

References

Abas M. 2015. Evaluation of Factors affecting the Quality of Construction Projects Technical Journal, University of Engineering and Technology (UET) Taxila, Pakistan Vol. 20(2).

Ahmad., Lakawa, I., Rachmat, L.M. 2020. Efektifitas Waktu Pelaksanaan Pekerjaan Rekonstruksi Jalan Wolo-Batas Kota Kolaka-Rate Rate. Sultra Civil Engineering Journal, Vol. 1(1).

Ferdian, M., Isya, B, Hafnidar, A., Rani. 2018. Analisis Hubungan Dan Pengaruh Faktor-Faktor Berkontribusi Terhadap Kinerja Mutu Proyek Konstruksi Jalan di Provinsi Aceh. Journal of Archive in Civil Engineering and Planning. E-ISSN: 2615-1340; P-ISSN: 2620-7567

Jaffar, M & Lakhiar, T. M. 2018. Factors adversely affecting quality in highway projects of Pakistan. International Journal of Advanced and Applied Sciences, Vol. 5(10), pp: 62-66.

Jose, C. M & Ambili S. 2017. Critical Factors Influencing Quality Performance in Construction Projects. International Journal of Recent Trends in Engineering & Research (IJRTER). Vol. 3(4).

Kausari, A. Zaidir., Wardi. 2016. Analisis Faktor-Faktor Yang Mempengaruhi Kinerja Mutu Pada Proyek Peningkatan Dan Pembangunan Jalan Kabupaten di Kabupaten Merangin. Jurnal Info Manpro, Vol. 6(3).

Lakawa, I., Sulaiman., Wulandari, D.A. 2022. Characteristics of AC-BC Asphalt Concrete Mix Using Oil Asphalt and LGA Asbuton as Binders. International Journal of Management and Education in Human Development, Vol. 2(1), pp: 58-63.

Laksono. 2016. Analisis Faktor-Faktor Kinerja Konsultan Pengawas Yang Berpengaruh Terhadap Waktu Dan Mutu Pekerjaan Proyek Peningkatan Jalan Di Kabupaten Probolinggo. Journal of Archive in Civil Engineering and Planning. Vol. 1(4), pp:174-183

Mulyono, A. T. 2016. Kinerja Pemberlakuan Standar Mutu Perkerasan Pada Peningkatan Dan Pemeliharaan Jalan Nasional – Propinsi. POROS TEKNIK. Vol. 6(1),pp: 1-23.

Rani. 2016. Analisis Hubungan Dan Pengaruh Faktor-Faktor Berkontribusi Terhadap Kinerja Mutu Proyek Konstruksi Jalan di Provinsi Aceh. Journal of Archive in Civil Engineering and Planning. E-ISSN: 2615-1340; P-ISSN: 2620-7567.

Subandiyah, A. 2016. Analisis Faktor-Faktor Kinerja Konsultan Pengawas Yang Berpengaruh Terhadap Waktu Dan Mutu Pekerjaan Proyek Peningkatan Jalan di Kabupaten Probolinggo. Jurnal Info Manpro. Vol. 7(2).

Susanti, R. 2018. Analisis Terhadap Variabel Yang Mempengaruhi Pemberlakuan Standar Mutu Pada Pekerjaan Pemeliharaan Jalan Di Propinsi Banten. Jurusan Teknik Sipil Universitas Sultan Ageng Tirtayasa. Jurnal Fondasi, Vol. 7(1).

Vadivel, S. and Doddurani, M. 2016. Analyzing the Factors Affecting Quality in Construction. International Journal of Engineering Research & Technology (IJERT), Vol. 4(33).

Yenri, N., Zaidir., Wardi. 2017. Analisis Faktor-Faktor Yang Mempengaruhi Kinerja Mutu Proyek Jalan Perkerasan Lentur Di Kabupaten Pasaman Barat. Volume 7.2, oktober 2017.

Published
2022-06-29
How to Cite
Ali, R., Lakawa, I., Hawa, S., & Sufrianto, S. (2022). Faktor-Faktor Yang Mempengaruhi Mutu Pelaksanaan Proyek Peningkatan Jalan Tedubara-Pising Kabupaten Bombana. Sultra Civil Engineering Journal (SCiEJ), 3(1), 32-40. https://doi.org/10.54297/sciej.v3i1.242

Most read articles by the same author(s)

1 2 3 4 5 6 > >>