Rekayasa Bahan Pada Pekerjaan Pengaman Pantai
Materials Engineering In Coastal Protection Works
Abstract
Material Engineering is used to find alternatives or ideas that aim to produce better / lower costs than the previously planned price with functional limitations and quality of work. The purpose of this research is to analyze the cost efficiency and time effectiveness after analyzing the value engineering method. The analytical method used is material engineering on the type of activity in the coastal protection building which includes the casting and installation of buis concrete, mortar and cyclone concrete work with the substitution of mixed concrete materials in the work. The results showed that the cost efficiency after analyzing with the material engineering method was 14.15% or Rp. 274,670,356 of the Budget Plan as well as the time after analysis with the effectiveness of material engineering on the Polemo Beach Security Work, Poleang Timur District by 15% or 3 weeks ahead of the implementation schedule.
Downloads
References
Agritama, R,P. 2018. Faktor – Faktor Yang Mempengaruhi Keterlambatan Proyek Konstruksi Di Surabaya. , Jurnal Rekayasa Dan Manajemen Konstruksi, Vol.6(1), pp:17-27
Alrizal, F,F. 2020. Identifikasi Faktor Penyebab Keterlambatan Waktu Dan Mutu Pekerjaan Pada Proyek Ruko (Rumah Toko) Green Junction Citraland. Jurnal Iptek Media Komunikasi Teknologi. Homepage Url : Ejurnal.Itats.Ac.Id/Index.Php/Iptek
Amir, A. 2015. Optimasi Biaya Pelaksanaan Konstruksi Jalan Dengan Aplikasi Rekayasa Nilai (Value Engineering). Vol.1(1)
Choiriyah, S. 2014. Penerapan Rekayasa Nilai Pada Penggunaan Bahan Penutup Kolom Dan Listplank Di Proyek Gedung Seed Growth Cropscience (Sgc) Pt. Bayer Indonesia Surabaya. Prosiding Seminar Nasional Aplikasi Teknologi Prasaranan Wilayah Ix (Atpw), Surabaya, 02 Juni 2016, Issn 2301-6752
Deshariyanto, D. 2019. Faktor – Faktor Yang Mempengaruhi Waktu Pelaksanaan Proyek Konstruksi Di Dinas Pu. Bina Marga. Kabupaten Sumenep. Jurnal Teknik Sipil Universitas Wiraraja Sumenep.
Fitrawansyah, D., Lakawa, I., Sulaiman. 2020. Pengaruh Penambahan Admixture Terhadap Kuat Tekan Beton Dari Berbagai Merek Semen. Sultra Civil Engineering Journal (SCiEJ), Vol. 1(2), pp: 110-126.
Ismael, I. 2014. Identifikasi Faktor - Faktor Yang Mempengaruhi Keterlambatan Pelaksanaan Pekerjaan Pada Proyek Pembangunan Gedung Di Kota Bukittinggi. Jurnal Momentum. Vol.16(1), pp : 1693-752x Sunandar Raksi, Irwan Lakawa, Sulaiman, Catrin Sudardjat
Kusnadi, 2016. Pengaruh Metode Pelaksanaan Terhadap Biaya Dan Percepatan Proyek Bangunan Gedung Rusun Tni Ad Samarinda. Jurnal Penelitian Teknika Vol. 16(2), pp:1 – 8. P-Issn 1411-6774.Lp4mp Universitas Islam Majapahit.
Nawawi, M. 2010. Analisa Rekayasa Nilai Pada Proyek Pembangunan Dermaga Peti Kemas Tri Sakti Banjarmasin Kalimantan Selatan. Prosiding Seminar Nasional Manajemen Teknologi Xii Program Studi Mmt-Its.
Plangiten,R, R, 2013. Pemilihan Sistem Pengamanan Pantai Dengan Menggunakan Metode Analytical Hierarchy Process (Studi Kasus: Pantai Wori Di Kecamatan Wori Kabupaten Minahasa Utara). Jurnal Sipil Statik Vol.1(8), pp:579-586.
Rahmawati, N., Lakawa, I., Sulaiman. 2021. Pengaruh Cangkang Kerang Laut Terhadap Kuat Tekan Beton. Sultra Civil Engineering Journal (SCiEJ), Vol. 2(1), pp: 46-54.
Sudiarsa, M. 2015. Penerapan Rekayasa Nilai Pada Proyek Konstruksi Gedung (Studi Kasus Proyek Pembangunan Gedung Balai Pengelolaan Sumber Daya Pesisir Dan Laut Denpasar). Jurnal Matrix Vol. 5(3), pp:20-29
Copyright (c) 2022 Sunandar Raksi, Irwan Lakawa, Sulaiman Sulaiman, Catrin Sudardjat, Sufrianto Sufrianto

This work is licensed under a Creative Commons Attribution 4.0 International License.