Abstract
The research was conducted using descriptive statistical methods, namely by analyzing data and questionnaires to determine the mean and then calculating the value of the Relative Interest Index (IKR). This analytical method will be very useful for identifying the rank of respondents and giving priority to study variables. The results showed that the factors causing CCO were the effect of cost (0.362) with a t count of 0.869. The dominant factors causing Contract Change Order (CCO) that affect cost and time are the contractor factor, then the influence of cost, natural conditions, planning & design, time, and the lowest one is the owner's influence.
Downloads
References
Adhar, Lakawa, I., Sufrianto. 2021. Sistem Informasi Geografis Kerusakan Jalan Berbasis Web.
Sultra Civil Engineering Journal (SCiEJ), Vol. 2(2), pp: 90-98.
Agsarini, I., & Wiguna, I. P. A. 2015. Pengaruh faktor kondisi proyek terhadap kinerja proyek konstruksi. Prosiding Seminar Nasional Manajemen Teknologi XXII, 1991, 1–8.
Ariani, V. 2016. Pengaruh Pekerjaan Tambah Kurang Terhadap Kinerja Proyek Kontruksi ( Studi
Kasus : Kantor Bupati Kabupaten Lima Puluh Kota ). 06(01), 53–69.
Dikdik, M.N.S. 2018. Faktor Penyebab dan Dampak Change Order Pada Proyek Konstruksi Bangunan Air.
Dzulqarnain, 2017. Analisis Faktor Penyebab dan Akibat Contract Change Order Terhadap Biaya dan Waktu pada Proyek Konstruksi Jalan di Sulawesi Selatan.
Fauzy, Y. 2019. Analisa Biaya Dan Waktu Dengan Metode ( Earned Value Analysis ) Pada Lanjutan Peningkatan Jalan Awang Long – Jalan Darmawan Desa Kota. 1–13.
Kerthajaya, I. K. 2014. Evaluasi Pengendalian Waktu dan Biaya Proyek Pembangunan Rumah Kost Dua Lantai di Keputih Tegal Timur Surabaya. 7(1), 53–62.
Maulana, A.2016. Faktor Penyebab Terjadinya Contract Change Order (CCO) dan Pengaruhnya Terhadap Pelaksanaan Proyek Konstruksi Pembangunan Gedung. Pem- Vol.02 No.02.
Martanti, A. Y. Y. 2019. Analisis Faktor Penyebab Contract Change Order Dan Pengaruhnya Terhadap Kinerja Kontraktor Pada Proyek Konstruksi Pemerintah. jurnal Rekayasa Sipil, 7(1), 32. https://doi.org/10.22441/jrs.2018.v07.i1.03
Perwitasari, D., Rahadianto, D., & Parapat, N. 2020. Identifikasi Dampak Contract Change Order Terhadap Biaya dan Kualitas Pada Proyek Gedung Laboratorium Teknik 2 Institut Teknologi Sumatra.
Prabowo, K. A. 2016. Analisa Pengaruh Perubahan Desain Terhadap Waktu, Mutu, Dan Biaya Dalam Pembangunan Hotel Di Kota Pekalongan.
Prayudi, A. 2017. Penyebab Dan Pengaruh Contract Change Order Pada Proyek Peningkatan Jalan (Studi Kasus Paket Kegiatan Jalan Pasar Panas-Bentot 2 Multiyears ). Jurnal Teoritis Dan Terapan Bidang Keteknikan, 1, 11–19. https://e-journal.upr.ac.id
/index.php/JT/article/view/1368/1152
Putra, H. E., & Sulistio, H. 2020. Pengaruh Change Order Terhadap Biaya, Mutu, Dan Waktu Pada Proyek Konstruksi Gedung Bertingkat. JMTS: Jurnal Mitra Teknik Sipil, 3(4), 1349.
Suroso, A. 2021. Analisis Faktor Penyebab CCO dan Pengaruhnya Terhadap Biaya Kontraktor Pada Proyek Jalan Tol. Jurnal Mitra Teknik Sipil 19.
Copyright (c) 2022 Rajanun Rajanun, Irwan Lakawa, Sitti Hawa, Haryono Haryono, Sufrianto Sufrianto

This work is licensed under a Creative Commons Attribution 4.0 International License.