Kinerja Waktu Pelaksanaan Proyek Pekerjaan Jalan Di Kabupaten Kolaka Utara (Studi Kasus Jalan Poros Lasusua Desa Totallang)
Abstract
The aim of the research is to find out or predict how much a project will cost during implementation and to find out the effectiveness of project control using the Earned Value Method. To overcome existing problems, an Earned Value method is used. There are two parameters or indicators used for analysis, namely BCWS, BCWP. Delay deviations can be identified by looking at the Schedule Variance (SV). This method can also be used to determine the efficiency of resource use in the form of the schedule performance index (SPI). The project implementation time aspect has a negative value up to the 12 th week of (SV) -Rp. 44,776,771.84 or schedule performance index (SPI) = 0.82 < 1. The calculation results are obtained from an effectiveness value of 0.85 for controlling project time using the Method Earned Value. In other words, the results of an effectiveness value that is smaller than 1 (one) can be said to be that the Time Performance for the Implementation of the Concrete Pavement Road Work Project in North Kolaka Regency is less effective. From the results of the time performance study using the Earned Value Method, it can be concluded that the Time Performance for the Implementation of the Concrete Pavement Road Work Project in North Kolaka Regency experienced a delay from the initial plan. It is clear that in weeks 1 to 12 the project performance was delayed from the planned schedule
Downloads
References
Clough dan Sears. 1991. Manajemen Proyek Konstruksi, Penerbit John Willey & Sons Inc, New Jersey (US).
Degarmo, E.P., dkk. 1984. Ekonomi teknik. Penerbit Macmilan, New York.
Dipohusodo, I. 1995. Manajemen Proyek Dan Konstruksi, Penerbit Kanesius, Jakarta.
Erivianto, W.I. 2002. Manajemen Proyek Konstruksi, Penerbit Andi, Yogyakarta.
Gray, C. F., dan Larson, E. W.2000. Project Management The Managerial Process, Penerbit Irwin McGrawi, Hill.
Husen, A. 2010. Manajemen Proyek, Penerbit Andi, Yogyakarta.
Jerry. 2001. Manajemen Nilai. Penerbit Pt Phehallindo, Jakarta.
Kerzner, H. 1995. Pendekatan Sistem Perencanaan,Penjadwalan, Evaluasi dan Pengendalian, Penerbit John Wiley & Sons Inc, New York.
Rosalina, D. 2013. Sistem Manajemen Pemeliharaan Perkerasan Jalan Dengan Metode Manual Pemeliharaan Rutin Jalan Untuk Jalan Nasional dan Provinsi Tahun 2011 (Review Manual No.001/T/BT/1995) dan Metode PCI (Pavement Condition Index),Thesis, Program Pasca Sarjana Universitas Gadjah Mada, Yogyakarta.
Soeharto, I. 1997. Manajemen Proyek Dari Konseptual Sampai Operasional. Penerbit Erlangga, Jakarta.
Copyright (c) 2024 Sufrianto Sufrianto, Vickky Anggara Ilham, Andi Makawaru Makkawaru, La Ode Altakdir Ilahi

This work is licensed under a Creative Commons Attribution 4.0 International License.