Faktor- Faktor Yang Mempengaruhi Proses Pelaksanaan Pekerjaan Jalan Lingkar Kota Kendari II
Factors Affecting the Implementation Process of Kendari II City Ring Road Works
Abstract
Project delays can come from service providers or other users who have an impact on additional time and expenses beyond the plan. If the delay comes from the contractor (Contractor), the contractor may be fined, as well as if the delay arises from the user of the service, the service user shall pay the loss incurred by the service provider, the amount stipulated in the contract in accordance with applicable legislation. Many studies have been done to determine the factors that cause the delay in completion of the project. Budgeted Cost of Work Scheduled (BCWS), describes the budget plan to a certain period of volume of the project plan to be done. Budgeted Cost of Work Performed (BCWP), describes the project plan budget for a certain period of what has been done on the actual volume of work. Land acquisition is the work of Kendari II railway project, at the time of execution of work there is a name of compensation made from the government to the community, if there is a community land whose land is affected by the project. The availability of budget is Kendari II road project, with length 38.15 km with budget amount Rp. 2.607.981.000,00 this is very limited. So that the contractor to carry out the project work according to the existing volume. Geographical conditions of the work of Kendari II city circle project, there are drawings of plans and work items before carrying out a project work. This research concludes that factors influencing the completion of construction project of Kendari II ring road.In accordance with the calculation of SPSS program (factor analysis) of 3 factors that affect the process of execution road construction project in Kendari City. The 3 factors that are contribution value in detail are: 1) availability of budget with value 93,3%, 2) land acquisition with value 68,5% and 3) Geographical condition with value 61,8%.
Downloads
References
Adoe M.L.DKK,2013.”KajianPenyebab Keterlambatan Pelaksanaan Proyek Konstuksi Gedung Di Kota Kupang.Jurnal Teknik Sipil,Vol.II,No.2 “.
Ahyaria,2000.“ Pengendalian system Produksi, Buku 1 dan 2, BPEF, Yogyakarta”.
Austen A.D. dan R.H.Neale, 2001. “Manajemen Proyek Konstruksi Pedoman, Dan Prosedur, PPM dan PT Pustaka Binamarga Pressindo,Jakarta “.
Anonim, Undang-Undang Republik Indonesia nomor 2tahun2017. “ Tentang JasaKontruksi “.
Hidayat.A,2004.“Faktor-faktor penyebab keterlambatan diproyekkonstruksi “.
Furqon.2004. “ Statistika terapan untuk penelitian,CV,Alfabet a,Bandung “.
Hasan. H, 2016. “ Jurnal Sipil Statik Vol.4 No.11 November 2016 (657-664) ISSN: 2337-6732 ”.
Ismiyati,2003. “Statika dan aplikasinya,Program Pasca Sarjana Univesitas .Diponegoro “.
Istimawan.D,2003.“Manajemen Proyek dan Konstruksi jilid1dan 2 , Kan Nisius,Yogyakarta “.Imam. S, 1997, “ Manajemen Proyek dari Konseptual sampai Operasional, Erlangga,Jakarta “.
Jervis B.M., Levin P., 2000, “ Construction Proyect Schedulling, Mc Graw Hill, NewYork “.
Karyanus, 2013.“ Faktor-Faktor Menghambat Ekonomi Teknik.Skripsi Universitas Indonesia “.
Mustafid,2003.“ StatikaTerapan,ProgramPascaSarjanaUniver sitas Diponegoro.
Singaribun K. Efendi S, 2000. “ Metode Penelitian survei, PT.Pustaka LP3 Indonesia,Jakarta “.
Singgih Santoso.2001.“ Carakerja Proses Perhitungan denganS PSS “.
Suharto.I,1995.“ Manajemen Proyekdari Konseptual sampai dengan Oprasional, Erlangga, Jakarta “.
Suyatno, Tri Vadli SetiaBudi,2001.“ Faktor penyebab keterlambatan proyek konstruksi Bangunan Gedung “.
Copyright (c) 2020 La Madu, Sunaryo Sunaryo, Laoede Musa Rachmat

This work is licensed under a Creative Commons Attribution 4.0 International License.