[1]
Sakinah, S., Mazpar, E. and Mulyati, E. 2025. Analisa Percepatan Dengan Metode Time Cost Trade Off Pada Proyek Pembangunan SPBI 2 × 200 Kl. Sultra Civil Engineering Journal (SCiEJ). 6, 1 (Apr. 2025), 446-457. DOI:https://doi.org/10.54297/sciej.v6i1.927.