[1]
Sufrianto, S., Ilham, V., Makkawaru, A. and Ilahi, L.O. 2024. Kinerja Waktu Pelaksanaan Proyek Pekerjaan Jalan Di Kabupaten Kolaka Utara (Studi Kasus Jalan Poros Lasusua Desa Totallang). Sultra Civil Engineering Journal (SCiEJ). 5, 2 (Oct. 2024), 398-410. DOI:https://doi.org/10.54297/sciej.v5i2.696.