Sakinah, S., E. Mazpar, and E. Mulyati. “Analisa Percepatan Dengan Metode Time Cost Trade Off Pada Proyek Pembangunan SPBI 2 × 200 Kl”. Sultra Civil Engineering Journal (SCiEJ), Vol. 6, no. 1, Apr. 2025, pp. 446-57, doi:10.54297/sciej.v6i1.927.