Sakinah, Sakinah, Ely Mazpar, and Ely Mulyati. 2025. “Analisa Percepatan Dengan Metode Time Cost Trade Off Pada Proyek Pembangunan SPBI 2 × 200 Kl”. Sultra Civil Engineering Journal (SCiEJ) 6 (1), 446-57. https://doi.org/10.54297/sciej.v6i1.927.