[1]
Ahmad, A., Lakawa, I. and Rachmat, L.O. 2020. Efektifitas Waktu Pelaksanaan Pekerjaan Rekonstruksi Jalan Wolo –Batas Kota Kolaka – Rate Rate. Sultra Civil Engineering Journal (SCiEJ). 1, 1 (Jun. 2020), 1-17. DOI:https://doi.org/10.54297/sciej.v1i1.50.